Double lining method
This is a method of applying a coating inside the piping without removing the existing water supply pipes.
Our company offers the "Double Lining Method," which allows for the formation of an anti-rust coating on the inner surface of piping without the need to remove steel pipe water supply lines from buildings. The cost is approximately 60% of the expense for replacing the piping, and it can rehabilitate aging pipes that are 30 to 40 years old and in severe deterioration. Additionally, re-lining is possible, leading to long-term cost reduction and an increase in asset value. 【Features】 ■ Uses a sweeper ball (made of urethane) to ensure even coating, including at joints ■ Can be reapplied multiple times ■ Re-lining is possible even for pipes lined by other companies ■ Leak-proof guarantee for 10 years (with two or more coats) and more *For more details, please download the PDF or feel free to contact us.
- Company:サニーダ
- Price:Other